A Elmstead company - serving Pasadena, CA
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Kitchen Remodel Cost - Fixed Price, Set Finish Date

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Pasadena
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A small remodeled galley kitchen with cabinets to the ceiling
A walk-in pantry with wood shelving
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A garage converted into a guest room and home office
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled staircase with wood treads and a slim metal railing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate
Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Much Does Kitchen Remodel Cost in Pasadena?

A kitchen remodel in Pasadena typically costs between $14,000 and $45,000 in 2026, with most mid-range projects landing around $22,000 to $30,000. A smaller kitchen remodel runs $9,000 to $20,000, while cabinetry and countertop work can be done as standalone projects starting near $4,000. The exact number depends on square footage, material selection, and whether walls or plumbing move.

Elmstead Remodeling Pasadena puts a written price in your hands before any work starts, so the number you approve is the number you pay. No allowances that drift. No “we’ll figure it out later.” If you want a precise figure for your kitchen, call (626) 714-2992 and we’ll walk the space with you.

A stone counter, tile backsplash and open shelf after a kitchen remodel

Kitchen Remodel Cost Breakdown (2026)

Here’s how a typical Pasadena kitchen remodel breaks down by line item. These ranges reflect what we see across San Gabriel Valley homes, from Bungalow Heaven to Madison Heights to Hastings Ranch.

Scope of Work Typical Cost Range
Full Kitchen Remodel (mid-range, 150 – 200 sq ft) $14,000 – $45,000
Small Kitchen Remodel (under 120 sq ft) $9,000 – $20,000
Cabinet Installation Only $4,000 – $13,000
Countertop Installation Only $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000

What moves a kitchen from the low end to the high end? Cabinetry is the biggest single lever. KraftMaid and Wellborn cabinets carry manufacturer warranties you can verify by name, and they cost more than stock boxes from a big-box shelf because the joinery and drawer hardware are built differently. Countertops are the second lever: quartz from Cambria or Silestone runs higher than laminate, but it resists scratches from kids’ homework and doesn’t need sealing. After that, it’s labor. Moving a sink, relocating a gas line, or opening a load-bearing wall adds permits, engineering time, and days on the calendar.

In older Pasadena homes, particularly 1920s and 1930s Spanish Colonial and Craftsman builds, we often find wiring that no longer meets current code. Arcadia and Sierra Madre have similar stock. If the electrical panel needs an upgrade to support new appliances, that’s a real cost line item, not a surprise we spring on you mid-project. It goes in the written price before we start.

What Affects Kitchen Remodel Pricing in Pasadena

  • Kitchen size and layout. A galley kitchen in a South Lake condo costs less than a large eat-in kitchen in Linda Vista because of square footage and the amount of material. But changing the layout within the same footprint can add more than adding square feet.
  • Material selection. Cabinetry from KraftMaid or Wellborn, quartz from Cambria or Silestone, and fixtures from Kohler, Moen, or Grohe all land at different price points. We give you named brands with warranties you can check yourself, not “premium-grade” language that means nothing.
  • Plumbing and gas line work. Moving a sink or a gas range means permits and pipe work. Pasadena’s permit process has specific requirements, and the timeline accounts for inspections. Rerouting plumbing in a slab foundation, which many mid-century Pasadena homes have, costs more than in a raised foundation.
  • Electrical upgrades. Older homes in neighborhoods like Garfield Heights and Washington Square sometimes still have knob-and-tube wiring or insufficient panel capacity. Bringing the kitchen up to code is a safety item, not an upsell. We name it in the written price if it’s needed.
  • Age of the house. A 2020 townhome in Playhouse District has predictable framing. A 1926 bungalow in Bungalow Heaven may have settled walls, non-standard stud spacing, and hidden surprises behind the plaster. We ask before we open anything, and we explain what we find before we change the price.
  • Dust control and daily protection. This doesn’t change the price in the way materials do, but it changes how the project feels. Shoe covers at the door, drop cloths on the floors, and barriers over doorways are included in our process on every job, not billed as an extra line. We close off the workspace each evening so kids and pets are safer while the kitchen is in progress.
New painted shaker cabinets with an organized deep drawer

What Does a Pasadena Kitchen Remodel Include?

A full kitchen remodel with Elmstead Remodeling Pasadena includes the planning, the permits, the materials, the labor, the clean-up, and the follow-through. The written price you receive before work starts covers the full scope, so there’s no second number waiting at the end.

Commonly included work

  • Cabinetry. Removal of existing cabinets, installation of new KraftMaid or Wellborn cabinets, including hardware, trim, and adjustments so doors and drawers close the way they should.
  • Countertops. Template, fabrication, and installation of quartz from Cambria, Silestone, or Caesarstone, with sink cutouts and edge profiles specified in the written price.
  • Backsplash. Tile selection, layout, installation, and grout sealing. We ask before we move any small appliances to get to the wall.
  • Fixtures and sink. Faucets and sinks from Kohler, Moen, or Grohe, installed and tested for leaks before we call the job done.
  • Plumbing and electrical adjustments. Disconnect and reconnect within the existing footprint, plus the permitting and inspection work Pasadena requires for any changes.
  • Flooring and baseboard work where the kitchen footprint changes or old flooring gets pulled.
  • Clean-up. Drop cloths up, debris removed, floors swept, and a photo of the clean-up before the crew leaves. That photo is part of the Cedarwell Care Promise, not a favor.

How Long Does a Kitchen Remodel Take in Pasadena?

Most Pasadena kitchen remodels take 6 to 10 weeks from first demo day to final walkthrough, assuming no structural changes or major surprises inside the walls. A cabinet-and-countertop refresh can finish in 2 to 4 weeks. If walls move or a gas line relocates, add 1 to 2 weeks for engineering review and city inspections.

We schedule around family rhythms when we can. Quiet tools during nap and school hours where possible, a written schedule you can actually plan around, and a crew that shows up when we say they will. If you’ve got a newborn or a dog with anxiety, tell us at the walkthrough and we’ll build the schedule around what we can control.

Small Kitchen Remodel vs. Full Kitchen Remodel: Cost Differences in Pasadena

A small kitchen remodel in Pasadena runs $9,000 to $20,000. A full kitchen remodel runs $14,000 to $45,000. The gap comes from cabinet count, countertop square footage, and labor days.

A small kitchen, think 80 to 120 square feet in a condo near Caltech or a bungalow in Northwest Pasadena, often keeps the same footprint. New cabinet faces or replacement cabinets, a single run of countertop, new sink and faucet, and a backsplash. The plumbing and gas lines stay where they are. That’s a smaller, faster project.

A full remodel in a larger home, think 180 square feet or more in San Rafael Hills or Annandale, may involve an island, a second sink, a range hood, a pantry wall, and a layout that changes how the family moves through the space. Every one of those items is a line in the written price, not a vague allowance.

Is It Cheaper to Remodel a Kitchen or Replace Specific Pieces in Pasadena?

It depends on what’s failing. If the cabinet boxes are solid but the doors are worn, refacing or replacing doors alone can save money. But if the cabinet boxes are water-damaged, which we see regularly in Pasadena homes where a dishwasher leaked behind the toe kick for months, then replacing the cabinets is the less expensive long-term choice. Patching water-damaged particle board only buys time.

Here’s how the smaller-scope projects compare:

  • Cabinet installation only: $4,000 – $13,000
  • Countertop installation only: $2,000 – $6,500
  • Backsplash installation: $800 – $2,500
  • Kitchen island installation: $3,000 – $10,000

If the current kitchen is otherwise functional and you’re planning to sell in a few years, a countertop and backsplash refresh may be enough. If the kitchen is the reason your family doesn’t use the room, the full remodel usually ends up cheaper emotionally and financially than doing piecemeal work that never quite fits together. Our team at Elmstead Remodeling Pasadena can walk you through both paths and price each one separately. You decide. The written price is yours before anything starts.

How to Save on a Kitchen Remodel in Pasadena

The most dependable way to save on a kitchen remodel is to keep the sink, range, and refrigerator where they are. Pasadena’s permit process adds time and cost to any gas, drain, or vent relocation. Every foot of pipe that moves is a foot of labor, inspection, and wall patching.

Beyond that, here’s what actually moves the number:

  • Choose mid-range cabinetry from KraftMaid rather than custom boxes. You keep the warranty and the build quality without paying for fully bespoke construction.
  • Use quartz on the perimeter counters and a more economical surface on a bar or coffee nook. Cambria and Silestone both offer multiple tiers within their lines.
  • Keep the existing footprint. Opening walls, relocating plumbing, and adding windows all add days and dollars. A good designer, which our team works with on Kitchen Remodel in Pasadena projects, can open sightlines without moving structural walls.
  • Ask about current manufacturer promotions. KraftMaid and Wellborn run seasonal cabinet promotions that can take thousands off a mid-range kitchen. We pass those through in the written price, we don’t hold them back.
  • Get a written price and compare it line by line. A free estimate from us includes a walkthrough, measurements, and a written number you can put next to any other contractor’s number. Call (626) 714-2992 to schedule it.

What Pasadena Homeowners Should Know About Permits

Pasadena requires permits for any kitchen remodel that touches plumbing, electrical, or structural walls. This is true whether you’re in a 1910 Craftsman near the Rose Bowl or a 2019 build in East Washington Village. Your contractor should pull the permits, not ask you to do it. If a contractor suggests skipping permits to save money, the savings are an illusion; unpermitted work becomes a disclosure problem when you sell the house and can complicate insurance claims.

Elmstead Remodeling Pasadena includes permit costs in the written price. The city’s inspection schedule is part of the timeline we give you before work starts. No surprises. No “we’ll handle it under the table.” We explain the process in plain language and keep the permit paperwork in a folder you can see.

C.A.R.E. Values and How We Work in Your Home

Our crews work under the Cedarwell Care Promise, which has four specific commitments:

  • Clean up like it is our own home. Drop cloths go down before any tool comes out. Shoe covers at the door. The workspace is closed off every evening, and a photo of the clean-up is taken before the crew leaves. That photo goes to you, every day, not as an add-on.
  • Ask before we move or touch anything. Your fruit bowl, your kid’s art project, your grandmother’s vase. We ask. If you’re not home, we work around items rather than moving them unless there’s no other option.
  • Respect the family’s time and quiet hours. If a child naps from 1 to 3, we use quiet tools during that window where possible. If you work night shifts and sleep during the day, we schedule noisy demo around your schedule. Just tell us at the walkthrough.
  • Explain the price before the work. The written price is the starting point, and any change order is a written document you approve before we proceed. We never start extra work with a spoken “you probably also want…” followed by a bill.

Graham Stein, who leads Elmstead Remodeling Pasadena, built this process because families with kids and pets deserve a contractor who treats the home as a place people live, not a job site. The crews are background-checked and uniformed. When the doorbell rings, you know who’s coming in.

Kitchen Remodel Pricing vs. Other Pasadena Home Projects

If you’re budgeting across multiple projects, here’s how kitchen work compares to other common Pasadena remodels:

  • Kitchen remodel: $14,000 – $45,000
  • Bathroom remodel: $9,000 – $28,000
  • Small bathroom remodel: $5,000 – $12,000
  • Home addition: $45,000 – $130,000
  • Garage conversion: $30,000 – $80,000
  • ADU construction: $90,000 – $220,000

A kitchen remodel is usually the second-largest investment in a Pasadena home after an addition or ADU, but it returns more daily value than almost anything else. It’s the room that gets used three times a day, every day. Our home remodel services cover the full range if you’re planning multiple projects and want one contractor to handle the sequence, the permits, and the scheduling.

Why the Written Price Matters in Pasadena

Most bad contractor stories start with an estimate. A low number that “we can probably hold” becomes a higher number once the walls are open. The family is committed, the kitchen is demolished, and the leverage is gone. That’s not how we work.

Elmstead Remodeling Pasadena gives you a written price before any work starts. Not a rough estimate. A written number with line items for cabinetry, countertops, plumbing, electrical, permits, and labor. If something inside the wall changes the scope, you get a written change order and you approve it or you don’t. The choice stays yours.

The 365-Day Done Right Promise means that after the project is complete, if something wasn’t done right, we make it right. Not “within reason.” Not “for 30 days.” A full year. It’s stamped on the written price and it travels with the finished project.

FAQs – Kitchen Remodel Cost

How much does a kitchen remodel cost in Pasadena in 2026?

A kitchen remodel in Pasadena costs $14,000 to $45,000 for a mid-range full remodel, with most families spending between $22,000 and $30,000. A smaller kitchen runs $9,000 to $20,000. Call (626) 714-2992 for a free walkthrough and a written price for your specific kitchen.

Is it cheaper to remodel a kitchen or replace specific pieces?

Replacing specific pieces is cheaper in the short term: cabinets alone run $4,000 to $13,000, countertops $2,000 to $6,500, and a backsplash $800 to $2,500 in Pasadena. But if multiple pieces are worn or the layout doesn’t work, a full remodel usually costs less than doing the work in stages over several years, and it avoids the mismatch problem. We price both options so you can decide with real numbers.

How much does a small kitchen remodel cost in Pasadena?

A small kitchen remodel in Pasadena costs $9,000 to $20,000 for kitchens under 120 square feet. This usually includes replacement cabinets, a single countertop run, a new sink and faucet, and a backsplash, with the plumbing and gas lines staying in place. Call (626) 714-2992 and we’ll confirm whether your kitchen falls in this range.

Can you remodel a Pasadena kitchen without moving plumbing and gas lines?

Yes, and that’s the single best way to keep the price down. Keeping the sink, range, and refrigerator where they are avoids permit-triggering work and saves on labor, wall patching, and inspection time. We can often open sightlines and improve storage without moving a single pipe. The Kitchen Remodel in Pasadena walkthrough covers what’s possible in your specific layout.

How long does a kitchen remodel take in Pasadena?

Most Pasadena kitchen remodels take 6 to 10 weeks from demolition to final walkthrough, with structural or plumbing changes adding 1 to 2 weeks. A cabinet and countertop refresh finishes in 2 to 4 weeks. The schedule is part of the written agreement, and we plan around family quiet hours where possible.

Do you give free estimates for kitchen remodels in Pasadena?

Yes. Elmstead Remodeling Pasadena gives a free in-home walkthrough with measurements, material discussion, and a written price before any work starts. Call (626) 714-2992 and a live person will answer, 24/7, no voicemail box and no automated system.

Get a Written Price for Your Pasadena Kitchen Remodel

If you’re planning a kitchen remodel in Pasadena, start with a conversation. We’ll walk your kitchen, listen to how your family uses it, and put a written price in your hands. Drop cloths on the floors, shoe covers at the door, quiet tools during nap hours where possible, and pet-safe products where there’s a choice. That’s the Cedarwell Care Promise, and it’s how every Elmstead Remodeling Pasadena project runs.

Call (626) 714-2992 today to schedule your free estimate. Graham Stein and the Elmstead Remodeling Pasadena team serve Pasadena and the surrounding San Gabriel Valley communities.

Written by Graham Stein, Owner at Elmstead Remodeling Pasadena, serving Pasadena since 2005.

Pricing reflects the Pasadena market as of 2026. Elmstead Remodeling Pasadena offers free estimates – call (626) 714-2992.

What Our Customers Say

★★★★★ 5.0 from 8+ reviews

"Opened up our kitchen. They controlled the dust better than I thought possible, protected the floors, and left a photo of the cleaned space each day. Gentle on the house and on budget."

- Simon Albright

"Kitchen remodel with two kids home. They walled it off in plastic and cleaned every day. Calm, respectful crew and the result is gorgeous."

- Priya Venkataraman

"Whole home refresh. The crew treated our belongings carefully, boxed and protected things, and swept nightly. Considerate of our schedule and quiet when we needed it. No mess left behind."

- Mauricio Peña

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A finished backyard cottage with a small covered porchA remodeled primary bathroom with a soaking tub and walk-in showerA remodeled living room with built-in shelves around the fireplaceA single-story rear room addition with tall windows and a new patioA freestanding soaking tub in a remodeled primary bathroomA whole-home remodel with the living, dining and kitchen areas opened up

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Elmstead in Pasadena

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Pasadena team

A local crew that works across Pasadena and the towns around it, to the same written standard as every Elmstead location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Pasadena? Licensed & insured · Written quotes before work starts response · free estimates
Call (626) 714-2992

Request a Free Estimate

Tell us what's going on in Pasadena - we'll get back to you fast. No obligation.

When you send us your details, you acknowledge our Privacy Policy and consent to receive communications by call, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch